Case Studies
Among the more confounding issues facing industrial-plant operators is the challenge of power factor correction. Though power factor can be explained simply as the ratio of useful power to the total power drawn from the grid, it can remain a puzzle to both understand and to address. Industrial operations are especially susceptible to power factor problems because of the dynamic loads they can incorporate. Cranes, welders, saws and other such equipment can create electrical conditions requiring...
Wharf Hotels announced the opening of The Murray Hong Kong hotel, an ambitious redesign of a government office building by renowned design firm Foster + Partners. The 336-room hotel uses custom-designed Big Ass Fans among its most inspired elements in a large indoor-outdoor space dubbed “The Arches.” Knowing of Big Ass Fans’ commitment to sustainability and elegant design, Foster + Partners approached the company with a drawing of a fixture they envisioned for the space. The r...
Eurotunnel releases official data demonstrating energy savings of 33 percent after the first season of operating a new cooling system for maintaining requisite temperatures in the landmark Channel Tunnel. The operator saved 4.8 GWh and approximately € 500,000 in 2017 courtesy of the new cooling system – equivalent to saving enough electricity to run 1,000 households. The newly released data from the operation of the new cooling system will dramatically boost Eurotunnel’s sustai...
Browse HVAC news
Related videos
Rheem Organizes Thrift Shop During NFCC’s Day Of Comfort Event
Cleveland Community College Leans On Data Aire For Ultra Precise Environmental Control
One Wilshire Economization Case Study - Data Aire - Precision Cooling Solutions