ClimateMaster Inc. - Experts & Thought Leaders
Latest ClimateMaster Inc. news & announcements
From the leaders in geothermal and water source heat pump technology comes a complete line of packaged rooftop DOAS systems built for efficiency, flexibility, and sustainability. The units are configurable to fit almost any project or application. From primary schools and higher education to condos, office buildings, hospitality, and more. Engineered to provide innovative solutions for indoor air quality, ClimateMaster DOAS units fit industry-standard curb, making them perfect for new installations or upgrades of existing units. Features For Improved Air Quality Retrofit Ready The systems are designed to fit the industry-standard DOAS curb, ensuring a seamless upgrade when it’s time to replace an existing system. Engineered for Any Climate Encased in a 2” double wall of heavy gauge G90 galvanized steel injected with polyurethane foam, all of the units are designed to operate efficiently no matter the climate. The Standard of Efficiency ClimateMaster DOAS systems are leaders in efficiency, exceeding ASHRAE 90.1 standards and providing significant long-term savings when it comes to utility costs. Lower Service & Maintenance Costs Created for improved serviceability and affordability, quarter-turn handles and friction hinges give easy entry into a large control and access compartment. Additional Features Fully integrated DDC Controls BAS interface with BACnet® and Modbus® MERV 8 standard filtration, configurable to MERV 14 High efficiency, variable speed EC condenser Capacities from 6 to 40 Tons 4-row, interlaced 14FPI Dual R-410A scroll compressors 2” double wall, heavy gauge G90 galvanized steel walls R-13 insulation with thermal break Dirty Filter Indicator (Optional)
ASHRAE, a global society advancing human well-being through sustainable technology for the built environment, announced a move to its new global headquarters, located at 180 Technology Parkway, Peachtree Corners, Georgia. The Society began renovations in January 2020 on an existing 66,700 ft building, originally built in 1978, on 11 acres of land. Located 10 miles north of its previous headquarters building, ASHRAE joins other innovation and sustainability-focused organizations based in the popular Technology Parkway corridor. Net-Zero energy buildings “ASHRAE’s new global headquarters is a prime example of how we are helping to pioneer a movement that many expect will ultimately make net-zero energy the ‘new norm’ in sustainable design and construction,” said ASHRAE Building Ad Hoc Committee Chair Ginger Scoggins, P.E. “Although new construction of net-zero energy buildings make a lot of headlines, reuse of existing structures is a basic tenet of sustainability – the energy performance of existing buildings must be addressed to substantially impact the 40% of primary energy consumed by buildings.” “ASHRAE’s goal for this project was to renovate a three-story 1970’s era, cheap energy period building into a high-performing net-zero-ready facility in a cost-effective way that can be replicated in the built environment industry,” said Technical Advisory Subcommittee Chair Tim McGinn, P.E. The photovoltaic (PV) system design is currently in progress. The building will be on its way to fully net-zero energy by March 2021 upon the completion of the PV system installation. Digitally connected solutions The headquarters building incorporates several digitally connected solutions such as remote monitoring" Focusing on the Society’s 2020-21 theme, “The ASHRAE Digital Lighthouse and Industry 4.0, the headquarters building incorporates several digitally connected solutions such as remote monitoring and analysis of building performance, with online dashboarding for transparency and advanced Building Automation System (BAS) integration with other systems, such as ASHRAE’s meeting reservations systems.” Other solutions include a digital twin and Building Information Model (BIM), innovative mechanical systems visible through open ceiling around radiant panel clouds and advanced conferencing systems designed to serve as a ‘digital lighthouse’ teaching resource. “ASHRAE’s first-of-its-kind headquarters building was designed as a living showcase of what's possible through technology integration to increase efficiency, protect people and property, and enhance the occupant experience,” said 2020-21 ASHRAE President Charles E. Gulledge III, P.E. “In addition to supporting ASHRAE’s technical standards, innovative product integrations from our generous donors also provide a scalable and repeatable model for a net-zero energy building design.” Fresh air distribution system Examples of technical features include: Radiant ceiling panel system: This is used for heating and cooling & dedicated outdoor air system for outdoor air ventilation with enthalpy heat recovery. Overhead fresh air distribution system augmented with reversible ceiling fans in the open office areas and displacement distribution in the learning center. Six water source-heat pumps (WSHPs): There are four on basement level and two on upper level atrium that will be used to condition these spaces. Demand Control Ventilation (DCV): This will be used for high occupancy spaces in the meeting and learning center. Air distribution is constant volume in office areas and provided by fabric duct, reducing diffuser count and duct branches. Modeling Energy Use Intensity of 17 kBtu/sf/yr. On-site electric vehicle charging stations available for guests and staff. Roof-top and ground mounted photovoltaic solar energy system planned for installation March 2021. 18 new skylights and reconfigured window/wall ratio. Useful daylight illuminance (>300 lux) at the work plane Window Wall Ratio (WWR) 79.9% Existing – New WWR east/west 33.5% - north/south – 41.9%. Prior to the COVID-19 pandemic, ASHRAE had already planned to provide 30% more outside air to the building than the required minimum ventilation rates from ASHRAE Standard 62.1 - Ventilation for Acceptable Indoor Air Quality and will implement other applicable guidance that has been developed by the ASHRAE Epidemic Task Force (ETF) for commercial office buildings. Building occupant health The building is located in a forest setting, close to hotels, restaurants and walking trails The building is located in a forest setting, close to hotels, restaurants and walking trails. A large deck overlooking a lake adjacent to meeting rooms can be fully enjoyed on sunny days. ASHRAE’s headquarters is 12 minutes and 6.2 miles from the Doraville MARTA station for easy access to Atlanta Hartsfield International Airport. The Society’s approximately 110-person staff officially moved into the building at the beginning October. “This move represents another significant milestone for ASHRAE,” said ASHRAE Executive Vice President Jeff Littleton. “In addition to showing our commitment to building occupant health and comfort, our new headquarters building will enable us to provide industry-leading support and service to our global volunteers, while driving innovation that will push our goal of sustainability in action forward.” Successful building campaign A team of ASHRAE volunteers led a highly successful building campaign to garner support for the renovation project. Thirty-one corporate donors committed more than $9.7 million in monetary support and gifts of equipment and services. ASHRAE thanks the following industry partners for their high-level support of the new global headquarters renovation project: NIBE, Cisco, Arkema, Daikin, Price Industries, Belimo, ClimateMaster, ClimaCool, Bell & Gossett, Big Ass Fans, Victaulic, Uponor, Mitsubishi Electric Trane, NTT and PlaceOS. Donors to the building campaign will be listed online and recognized in a special new headquarters commemorative magazine to be published in January 2021. Sustainable built environment ASHRAE’s new global headquarters is an example of an effective built environment" Additionally, ASHRAE members have given over $500,000 to date. In total, ASHRAE has received over $10.2 million from generous stakeholders, making a strong statement about their commitment to ASHRAE’s mission and to a shared vision of a healthy and sustainable built environment for all. “ASHRAE’s new global headquarters is an example of an effective built environment that fully considers the importance of effective operations by installing the systems and equipment in a manner that facilitates operation and maintenance,” said 2019-20 ASHRAE Presidential Member and Building Ad Hoc Committee Member Darryl K. Boyce, P.Eng. “We are grateful to our donors for their generous support and partnership. It is this support that not only shows our donors’ alignment with ASHRAE’s sustainability goals, but helps us to address the challenges of designing and operate buildings in a technology driven environment.”
ClimateMaster attended the NET Conference February 3-5, 2020 in Amelia Island, Florida. At the NET Conference co-ops and businesses meet. Attendees were everything from industry trends and emerging technologies to best practice sharing and valuable on-the-job intangibles. More information from the conference can be found on ClimateMaster’s Facebook or Instagram.
Leveraging Radiant And Hydronics To Help Achieve Decarbonization Goals
DownloadSealed Connectors In Harsh Environments
DownloadPowering And Cooling Next Generation Data Centers
DownloadDebunking Myths To Promote A Bright Future For Heat Pumps
DownloadOptimizing Comfort: The Ultimate HVAC Component Guide
Download