When it comes to smoke ventilation it requires a thorough approach to servicing in order to ensure optimum operational effectiveness.

Elta Fans Applied Technology to discuss the five common traps one often fall into with smoke ventilation maintenance:

Fitting and forgetting

The smoke ventilation systems are the most important component in providing a level of reassurance across all applications and are an integral part of building safety.

However, as a result of only being required in worst-case scenarios, one is often guilty of neglecting the necessary ongoing maintenance or servicing, thus resulting in lower operational effectiveness and putting occupants at higher risk of danger.

Incorrect storage

Right from the outset, it is important that the smoke ventilation products are correctly stored. Often, when part of a larger project these fans are not immediately installed and they are instead left to sit on site for up to several weeks or even months. In these circumstances, it is vital that they are kept in the right environment to prevent long-term damage or a reduction in performance.

Keep the fan in a clean, dry area, and free from corrosive fumes, vibration, and dust

Furthermore, one should keep the fan in a clean, dry area, and free from corrosive fumes, vibration, and dust. Special care should also be taken in avoiding temperature fluctuations; a good tip would be to remove any shrink wrap that may have been used to house the product during transportation. This typically acts like a greenhouse meaning it gets excessively hot in the sun and can encourage condensation to form.

Also, advise rotating the impeller on a monthly basis, and making sure it definitely does not return back it to its original position to prevent grease separation and damage to the bearings. In cases where fans must be stored for more than two years, bearings and grease lines should be flushed and repacked with fresh grease.

Lack of ongoing servicing

Once in place, without regular checking and inspection of the equipment, including all parts of the system, the operational lifespan of the fan can be significantly decreased. As a general rule, an inspection of the equipment should take place every six months, including the testing of AVs, spinning the impeller, and checking the running current.

Failing to pass on the responsibility: As with any project, it can be difficult to place it in the hands of another once the role has come to an end. One of the biggest challenges for contractors, engineers, and anyone else tasked with installing systems is that once it is in the possession of end-users, you effectively lose sight of it.

This is where it is important to stress the responsibility that the system owners have to ensure the fans remain operational. If smoke ventilation is not correctly maintained, they need to be aware that they risk becoming liable.

Not following guidance

The installation and maintenance manuals have all the guidance and best practices one needs With so many components to consider with the smoke ventilation systems, you can be forgiven for finding it difficult to keep up and follow all the best practices. The installation and maintenance manuals have all the guidance and best practices one needs.

For example, one would recommend that motor bearings are replaced after 20,000 hours of operation, or depending on whichever’s earlier, five years of service in normal, ambient conditions.

Other areas of note include the rule of three:

  • An insulation test every three months
  • Checking the tightness of fixings every three years
  • Cleaning the impellers every three years

Keeping maintenance records

For more arduous environments such as transport or marine in which there is likely to be vibration and shock, maintenance checks should be more regular.

Finally, it is vital that a maintenance record is kept and best practice is followed. It is also important to note that all maintenance work must be carried out by the manufacturer’s ‘authorized representative’.

Download PDF version Download PDF version

In case you missed it

2025 AHR Expo: Top Innovations In HVACR Announced
2025 AHR Expo: Top Innovations In HVACR Announced

The AHR Expo (International  Air-Conditioning, Heating, Refrigerating Exposition) today announced the winners of the 2025 AHR Expo Innovation Awards. Winners are chosen annua...

Johnson Controls Center Develops And Tests HVAC Systems For Data Centers
Johnson Controls Center Develops And Tests HVAC Systems For Data Centers

Johnson Controls’ Advanced Development Engineering Center (JADEC) in New Freedom, PA., about 25 miles from Philadelphia, highlights and demonstrates the company’s capab...

Airzone Aidoo Pro Enhances VRF Energy Efficiency
Airzone Aidoo Pro Enhances VRF Energy Efficiency

The Olsen Group, based in Boca Raton, Florida, is a national pioneer in HVAC energy optimization. Donald Olsen and his seasoned team of HVAC control specialists have been in busine...

vfd