Download PDF version

Armstrong Fluid Technology has introduced the enhanced Design Envelope IPC 9521 Integrated Plant Control System designed to significantly improve the operating efficiencies of plants using either identical or non-identical chillers.

Designed with advanced operating algorithms to reduce energy and water consumption, the TowerMax option is an optimization feature that can help variable speed chiller plants achieve up to 45% energy savings. It compliments both new and existing Building Management Systems (BMS) and works with all brands of chillers and cooling towers to meet the requirements of Green Mark, an industry-leading green building rating system.

IPC 9521 Integrated Plant Control System

The combined solution optimizes the entire chiller plant and reduces operating costs"

The new IPC 9521 Integrated Plant Control System and the TowerMax option reinforce our 2 by 22 sustainability commitment to provide the most innovative energy-savings solutions possible,” notes Peter Thomsen, Director, Building Systems Solutions. “The combined solution optimizes the entire chiller plant, reduces operating costs and significantly enhances a building’s HVAC system reliability.”

Other features of the Design Envelope IPC 9521 Integrated Plant Control System include:

  • Controls up to five chillers, cooling towers and BAS
  • No limitations on plant size or cooling capacity
  • Pre-programmed and pre-tested for easy installation
  • Drift management capabilities
  • User-friendly screens and predefined communication settings
  • Low installed cost, with upgrade options

The TowerMax option also includes a one-year subscription to Armstrong’s ECO Pulse Performance Management Service. ECO Pulse maximizes and maintains water and energy savings for the entire plant.

Download PDF version Download PDF version

In case you missed it

LG HVAC Premier Service Champion Program Launch
LG HVAC Premier Service Champion Program Launch

Global HVAC technology pioneer - LG Electronics continues to set new standards in HVAC training and customer service excellence with the launch of the Premier Service Champion Prog...

What Is The Most Overlooked Factor When Installing HVAC Systems?
What Is The Most Overlooked Factor When Installing HVAC Systems?

Installing HVAC equipment is not as simple as plugging in an appliance. Installers often face many hurdles, including complex system design, space constraints, accurate sizing and...

Viessmann Launches Vitotrol 100-E Modulation Control
Viessmann Launches Vitotrol 100-E Modulation Control

Viessmann Climate Solution UK's Vitotrol 100-E Modulation Control is now available for new Vitodens 050-W gas condensing boilers, allowing end-users to wirelessly control their hot...

vfd