The Tower of London is one of six historic buildings under the care of independent charity, Historic Royal Palaces (HRP). As one of Britain’s most important historic buildings, and home to priceless treasures including the Crown Jewels, it is vital that any works commissioned by HRP deliver best value-for-money and reliability.

Principal contractor, EV Bullen, was responsible for the execution of the project from the design phase through to practical completion and handover.

Delivering comfort cooling

By convening the project team very early on in the design stage and enabling effective communication between the critical stakeholders, including Airedale International, and the rest of the project team at every stage of the project, many of the potential risks typically associated with a scheme of this scale, involving multiple capital plant suppliers, were pre-empted.

As part of a major refurbishment program, Airedale was selected to supply two Ultima™ twin circuit compact chillers to deliver comfort cooling to the building. The unique nature of the building’s design and fabric required Airedale to reduce the footprint of each chiller by just 75mm so that it could be moved into position through existing structural openings without damaging the building’s structure.

Maximizing energy efficiency

Enabling the units to closely match cooling demand and so minimize energy consumption

Reducing the dimensions of the chillers allowed fully assembled, fully tested units to be delivered to site, cutting time and cost in assembly and commissioning, and ensuring a smooth transition to the new cooling plant. In addition to best value in capital and operational costs, other key considerations were quality, performance and reliability, and access to professional service and quality components at the end of warranty.

To maximize energy efficiency, four stages of cooling are available, enabling the units to closely match cooling demand and so minimize energy consumption. When components work at part-load, wear and tear is also reduced, improving reliability and extending unit life. Modulating head pressure control also ensures energy-efficient operation of the condenser fans whilst protecting the system in low ambient conditions.

Exceeding every expectation

Units are also designed to ensure easy access to components, simplifying maintenance. To maintain acceptable sound levels, the compressor enclosure is lined with 40mm acoustic material. To ensure performance to precise specifications, the units were commissioned onsite by Airedale engineers who also provided training.

We are delighted with the successful outcome of this project. A building as unique and cherished as the Tower of London requires the highest levels of quality, attention to detail and understanding of the complexities involved. Every member of the project team met and exceeded every expectation,” said Ken Deal Project Manager, EV Bullen.

Download PDF version Download PDF version

In case you missed it

Carrier BluEdge: Lifecycle Service For Data Centers
Carrier BluEdge: Lifecycle Service For Data Centers

Carrier is proud to introduce new BluEdge® lifecycle service offerings as part of the growing QuantumLeap™ portfolio of scalable, purpose-built solutions designed for dat...

Finding An HVAC System That Meets Multiple Design Goals
Finding An HVAC System That Meets Multiple Design Goals

Meeting a project’s overarching design goals is vital in the building and construction sector. Creating a sustainable building could be one of these goals — driven by c...

ATMO America 2025: Natural Refrigerants Summit
ATMO America 2025: Natural Refrigerants Summit

ATMOsphere, publisher of NaturalRefrigerants.com, has announced that the dates for its ATMOsphere (ATMO) America Summit 2025 will be Wednesday, June 11, and Thursday, June 12, 2025...

vfd