Download PDF version

AET Flexible Space has completed a major upgrade of the underfloor air conditioning system at a historic building located in the Clerkenwell area of London, The Bond Works building at 77-79 Farringdon Road.

The building was originally constructed in 1882 as the London premises of Lincolnshire-based engineering firm, Marshall & Sons, and previously underwent a full redevelopment in 2007 by a group of private investors. 

The eight-story building is located on a prominent corner position, with floor-to-ceiling glazing ensuring that each floor benefits from optimum natural light.  The exposed brick and ironwork grants a contemporary warehouse-style finish to the six extensively refurbished floors. 

Underfloor air conditioning

Underfloor air conditioning was specified and installed for the height-restricted building in 2007, along with other energy-saving design features such as nighttime ice storage. 

As part of the recent works, AET Flexible Space was successful in its bid to upgrade the existing downflow unit controls and replace all fan terminals on the six refurbished floors with AET Fantiles.

Integrated controlling systems

With underfloor air conditioning systems, fully conditioned air is fed into the plenum by zonal downflow units (CAM), which are then supplied into the workspace via fan terminal units (Fantile). 

The Fantile units feature integrated controllers where users can personally adjust fan speed and temperature 

The Fantile units feature integrated controllers where users can personally adjust fan speed and temperature to suit their own comfort.  Systems can be configured with underfloor or high-level return and can easily integrate with passive or other ventilation systems. 

The existing system at Farringdon Road is the equivalent to an AET CAM-V system, supplying conditioned air via the floor plenum and receiving spent, used air back at a high level for re-conditioning. 

Upgraded the existing units

Working for Twenty1 Construction and new building owners, NFU Mutual, AET engineers upgraded the existing units with AET control boards, associated cabling, new actuators, and filters. 

140 TU4-AC Fantiles were supplied for the six floors of speculative Cat-A accommodation with the capacity to add additional terminals for tenant fit-out.  The final result is a spectacular, contemporary “cutting edge meets heritage” workspace, blending historic features with new modern services in the heart of the Clerkenwell business district.

Download PDF version Download PDF version

In case you missed it

LG Accelerates B2B Growth With Key Structural Changes
LG Accelerates B2B Growth With Key Structural Changes

LG Electronics (LG) announced a series of organizational changes and executive appointments following the approval of its board of directors. This restructuring aims to accelerate...

Shortwave Infrared Heating: SWIR: The Smart Choice For Warehouse Heating
Shortwave Infrared Heating: SWIR: The Smart Choice For Warehouse Heating

For warehouse and factory owners, cutting their heat energy bills by over 90% might seem like a pipedream. I’ve been in enough warehouses to know one thing: heating them is e...

Genea And Siemens Partner To Enhance Physical Security Solutions
Genea And Siemens Partner To Enhance Physical Security Solutions

Siemens and Genea recently announced a second collaborative effort to provide security professionals and facility managers with improved security using the cloud. The security so...

vfd