Download PDF version

Adcock Refrigeration and Air Conditioning Ltd. (Adcock) was approached to carry out a health check survey on a chiller plant at Leicester City Football Club’s (LCFC) King Power Stadium home ground, as the club believed the plant needed to be upgraded.

Maintenance of chiller plant 

Adcock’s report findings showed that replacement of the plant was, in this case, unnecessary and in fact, following several recommended repairs, the system just needed maintaining correctly by experienced engineers.

A wealth of Adcock’s engineering experience has put the client at ease and as a result, the company was awarded a maintenance contract as well.

Replacing equipment is large investment and shouldn’t be made without proper data analysis. Adcock’s expert engineers are always on hand to provide the most efficient, as well as cost effective solutions to cater to client’s air conditioning & refrigeration needs.

Download PDF version Download PDF version

In case you missed it

LG Accelerates B2B Growth With Key Structural Changes
LG Accelerates B2B Growth With Key Structural Changes

LG Electronics (LG) announced a series of organizational changes and executive appointments following the approval of its board of directors. This restructuring aims to accelerate...

Shortwave Infrared Heating: SWIR: The Smart Choice For Warehouse Heating
Shortwave Infrared Heating: SWIR: The Smart Choice For Warehouse Heating

For warehouse and factory owners, cutting their heat energy bills by over 90% might seem like a pipedream. I’ve been in enough warehouses to know one thing: heating them is e...

Genea And Siemens Partner To Enhance Physical Security Solutions
Genea And Siemens Partner To Enhance Physical Security Solutions

Siemens and Genea recently announced a second collaborative effort to provide security professionals and facility managers with improved security using the cloud. The security so...

vfd