10 Feb 2022

A 4-Star Hotel & Resort located in South Florida unveiled a $1.5 billion expansion in 2020 boasting more than 1,200 luxury guest rooms in three hotel towers, and a large entertainment venue seating more than 7,000.

The Concern:

The resort had complaints about musty odors and microbial issues within the chilled water Fan Coil Units (FCU’s) in the older section of the resort. Additional fouling was also the result of recent construction projects at the hotel.

PURE-Steam Coil Cleaning and restoration process

To get ready for Super Bowl LIV Pure Air Control Services was chosen as the contractor of record to perform its proprietary PURE-Steam Coil Cleaning and restoration process on 450 resort units to improve IAQ, promote energy savings and add comfort helping get the resort ready for the big show.

The hotel realized a 76.11% reduction in particulate load, 215,000 cubic feet per minute of airflow added, 527 tons of cooling added, and $322,548 in energy savings with a payback of fewer than 2 years.

The Results:

  • 11% Reduction In Particulate Load Improvement In IAQ
  • 84.08% Cfm/Min Improvement
  • 527 tons Total Cooling Capacity Added To Resort
  • Estimated Total Energy savings, ROI: 43 years

Benefits of the PURE-Steam Coil Cleaning Process:

  • Sanitizes the coil/blower assembly
  • Removes latent debris from deep within the coil
  • Creates improve airflow
  • Creates better cooling capacity
  • Saves energy
  • Improves indoor air quality
  • Reduces HVAC related work orders
  • Extends HVAC equipment