19 Feb 2020

As globally renowned UK-based pharmaceutical and drug-maker company, Napp Pharmaceutical’s air conditioning and refrigeration service supplier, Adcock Refrigeration and Air Conditioning Ltd. (Adcock), recently carried out an energy inspection to keep them TM44 standard compliant.

A TM44 standard compliance inspection is mandatory every five years, if air conditioning systems have a combined rated output of more than 12kw (kilowatts). Local councils can enforce a fine if an inspection is not carried out within the stipulated period.

Adcock’s innovative reporting system

Adcock’s innovative reporting system is designed for clients’ analysis of the energy consumption by equipment on site and identifies how to best carry out savings. This intelligence is presented as an easy-to-digest report, including an indication of the system’s running costs, its Energy Efficiency Rating (EER), practical suggestions for improvement with photographs, details of F-GAS and refrigerants, plus certificate to prove that the HVAC equipment TM44 compliant.