9 Oct 2019

Adcock Refrigeration and Air Conditioning Ltd. (Adcock) was approached to carry out a health check survey on a chiller plant at Leicester City Football Club’s (LCFC) King Power Stadium home ground, as the club believed the plant needed to be upgraded.

Maintenance of chiller plant 

Adcock’s report findings showed that replacement of the plant was, in this case, unnecessary and in fact, following several recommended repairs, the system just needed maintaining correctly by experienced engineers.

A wealth of Adcock’s engineering experience has put the client at ease and as a result, the company was awarded a maintenance contract as well.

Replacing equipment is large investment and shouldn’t be made without proper data analysis. Adcock’s expert engineers are always on hand to provide the most efficient, as well as cost effective solutions to cater to client’s air conditioning & refrigeration needs.